Day 163: windows
the window guys put the glass in the frames. and that was it for today. the boys are waiting for stairs and stuff to be done. so they...


Day 162: green green glass
The glass for the windows arrived for the house. I assume they will install it tomorrow since it wasn't installed today. the main water...


Day 161: More and more steps
The guys were working on the 2nd half of the stairs. While Luis worked on this set of stairs by himself. Here is the other house. I'm...


Day 160: Stairs
They started making the stairs for the upstairs terrace. The bathroom tiles upstairs shows where the bathtub will be. it looks low..and...


Day 159: windows and terrace
Today the window frames went in and Jesus the aluminium carpenter double checked with me what kind of glass i wanted in the bathrooms ...


Day 158: Last bathroom and terrace plans
IT's a lot to think about when you're talking about the floor of the shower and then looking for interior doors and measuring the kitchen...


Day 157: a week later
I went to Sevilla for a week and left the house to plod along quietly. I thought I could come back to a surprise. Turns out I don't...


Day 150: filling in the floors
The 2 studios were finished. These floors had to be done all in one day. So miguel apparently stayed until approx 7pm because he had to...


Day 149
The floors were finally filled today. It's polished cement in both studios. They let me dump the cement too. It was easy but heavy. In...


Day 148: Black vs. grey. Learning to Grout
When I got to the house the guys were taping up the walls with plastic to prepare for the cement on the floor. The cement guy was finally...