Wood do you know?
Ok, I ordered the wood from a guy called Orlando. He's a carpenter from Gran Canaria. He had a friend who was closing down his shop and...


Wire we're waiting
​While the guys are on holiday resting. Manzano the electrician is putting all the wires in the tubing. I took some pictures for you to...


Tiles Ordered, closets designed
Today I made the order for the bathroom tiles. Ouf! big load off my chest. but at the end, it was quite easy. I told myself to stop...


Last day
So the second last day of work ended up being the last day of work. They finished the little bit and then left early. Now I'm working...


Day 130: Second last day before the long break.
I tried to get to the house before they left but I was so swamped with paperwork that by the time I got there they were gone :( I can't...


Day 129: Painting is done!
Well more or less. there are a few walls that need painting but i think they are letting the cement rendering to dry fully....I think....


Day 128: dust = sinus infection + headache
Today I continued painting the asphalt. but in order to do that, you need to clean the surface first. and to clean the surface, you need...