top of page

Day 162: green green glass

The glass for the windows arrived for the house. I assume they will install it tomorrow since it wasn't installed today.

the main water valves for the bathrooms are in the ceiling so that just in case there's a leak, you'll notice it dripping from the ceiling immediately. but in the workshop and studio, the main valves are outside because the ceiling spaces are used for storage. here they are.

This is the guest house being built. look how tidy they are!

They glued the pvc to the foundation and the blocks sit on a second layer of pvc. it looks really tidy.


About Eva  
Recent Posts
Archives
Our Community 

To be a part of Little Pond, please click here. 

Join our mailing list

Never miss an update

bottom of page