Day 161: More and more steps
The guys were working on the 2nd half of the stairs. While Luis worked on this set of stairs by himself. Here is the other house. I'm...


Day 160: Stairs
They started making the stairs for the upstairs terrace. The bathroom tiles upstairs shows where the bathtub will be. it looks low..and...


Day 159: windows and terrace
Today the window frames went in and Jesus the aluminium carpenter double checked with me what kind of glass i wanted in the bathrooms ...


Day 158: Last bathroom and terrace plans
IT's a lot to think about when you're talking about the floor of the shower and then looking for interior doors and measuring the kitchen...


Day 157: a week later
I went to Sevilla for a week and left the house to plod along quietly. I thought I could come back to a surprise. Turns out I don't...


Day 150: filling in the floors
The 2 studios were finished. These floors had to be done all in one day. So miguel apparently stayed until approx 7pm because he had to...


Day 149
The floors were finally filled today. It's polished cement in both studios. They let me dump the cement too. It was easy but heavy. In...


Day 148: Black vs. grey. Learning to Grout
When I got to the house the guys were taping up the walls with plastic to prepare for the cement on the floor. The cement guy was finally...


Day 147: Bathroom 2 done
The studio and workshop bathrooms have the tiles put in. We discussed the colour of the grout and agreed on them bringing the black and...


Day 146 bathroom tiling
Luis is going solo now. He's doing the bathroom alone. He says he wants to do it himself so that it's done right. ​ Here's luis cutting...