Day 171
Green glass installed int the studio door frames. Glass put in. This wood is only 2 mm hardwood and the rest MDF. ya, i don't think we're...


Day 170
Sewage behind the workshop buried pipes covered terrace ready for the cement Ready for the cement to be poured on the entrance terrace we...


Day 169
This is the area where I'm going to have my big pit. This is the back of the house where the sewage tubes were buried. the little grey...


Day 168
Window frames went in. The guys measured out the terrace for me. I showed them a picture from houzz.com and they said easy. this is what...


Day 167
the guys started measuring out my terrace pit. I can't wait. and they said it would be easy. :) :) :) Today the wall was finished. He...


Day 166
rendering the steps The stone wall is coming along. it takes a lot of time. Painting the rooftop again....honestly I have no idea how...


Day 165
The guys started working on the outside stairs today. Still working on the wall by the entrance. ​ ​These steps are in the terrace. to...


Day 164
Today was actually a national holiday. but the guy who came to build the stone wall came to work. He works everyday regardless of...


Day 163: windows
the window guys put the glass in the frames. and that was it for today. the boys are waiting for stairs and stuff to be done. so they...


Day 162: green green glass
The glass for the windows arrived for the house. I assume they will install it tomorrow since it wasn't installed today. the main water...