

Day 62 part 2: the walls upstairs
​There were a lot of pictures today so I thought i'd separate it into 2 posts. Here are the walls that they built up for the second...


Day 62: revealing the ceiling
Today the guys finished part of the walls upstairs and then started taking down the supports which were holding up the roof. the cement...


Day 61: working at the speed of lightning
Today the guys were working really fast. Little talking and moving fast. I was kind of caught off guard and didn't know where to...
Changes are inevitable
Of course changes were going to arise. With the guys talking non stop and friends with all their different ideas. I'd say the most...


Day 60: Every wall is different
When I arrived, they were doing the walls over the workshop. Easy peasy, lemon squeezy! Low brick walls. But it took me at least 3 full...


Day 59: More brick walls?!?
​Yes! the rooftop has a boarder wall around the entire edge of the house. This is how they bring the water up to the roof top. THere's a...


Day 58: One down, hopefully no more to go
Today we saw a brick fall from the roof! But let's look at how they do the rooftop first. Un bloque cayo. pero vamos a ver como sucedió...


Day 57: Block after block after block
Putting in the blocks. So I finally saw how they bring the blocks up to the roof. There's a truck that comes to deliver them and the guys...


Day 56: Covering the studios
Covering the studios is a big feat. There are no pillars holding the roof up. If I'm not mistaken, there will be a steel rebar going...


Day 55: The Long wait
The guys took off all the supports along the side but they left the support posts inside the house. Those will be there for a month to...