Day 95: all about the timing
The guys are going around the house just doing the east and west walls. I'm not sure what their logic is but it's getting done. Maybe...


Day 94 same same...not really different
​The guys moved over to the house side. I started working on the second floor. Thats literally the only difference today. These are the...


Day 93: moving onto the outside
The guys started rendering on the outside. They are almost finished the stairs. I thought they would actually finish making the stairs...


Day 92
The guys are prodding along with the pre door frames and the rendering. I was in town dealing with paperwork so I only saw them early in...


Day 91:door frames. finishing off the rendering in the studios
There were still some odd sections that I didn't know the guys had to finish. they fit in the frames and then rendered the rest of the...


Day 90: 2 down, lots to go
The guys finished the majority of the workshop and studio. Not quite sure what they're going to do next. I didn't help them today because...


Day 89: same old same old
The rendering by hand will take a really long time. They calculate about 2 months. I assume they are including all the holidays. When...


Day 88: premarcos....don't know the english word...
​As the guys were rendering the aluminium guy came and put together the frames for the windows and doors. The aluminium guy is outside of...


Day 87: Let the Rendering begin!
​I figured out what that bit thing in the back of the workshop was. They guys were preparing to render the ceiling! When I arrived today...


Day 86: covering the pipes
​The guys started covering the electricity pipes in the floor with the mortar. ​They also filled in the gaps that we had chiseled out to...