DAY 19: Pouring the Cement!
The cement went into the foundation today! They finished about 3/4 of it. You can see the sewage tubes sticking out and copper wiring for...


Day 18: Plumbing tubes before the cement
Today the guys were putting in the plumbing for the drainage so that when the cement goes in, there's still a path for the water and...


Weekend Weeding 2
I spent the afternoon beginning the path at the base of the mountain in front of the dance studio. The idea is to just do organically,...


Day 17: Putting in the steel - day 2
Today they are finishing putting the steel in the foundation. This morning, they were tying up the steel pillars to the horizontal beems...


Day 16:Putting in the Steel - day 1
It began raining today. It rained sporadically. Sometimes light rain and sometimes heavy. But rain or not, They put in the steel along...


Day 15: Waterproofing foundation
Today they put a layer of PVC plastic to keep the humidity from getting into the foundation. It's kind of like wraping a present. They...


Day 14:Preparing the Foundation
They filled in the blocks with sand and compacted it. I went back at the end of the day and they had finished packing the soil and...


Day 13: The base of the Foundation
Putting the safety sign up. The base of the foundation is above ground. SInce the land is all rock, there is no need to dig. The entire...


Weekend Weeding
Jesus came to help me pull out some weeds on the mountain on the land. and we pretty much got rid of everything on the P2 side of the...


Day 12: Finishing the Foundation Outline
Today they finished pouring the concrete on the outline of the structure. Yesterday they dug the part the machine missed and compacted it...