top of page

Day 18: Plumbing tubes before the cement

  • Writer: Eva Hu
    Eva Hu
  • Feb 22, 2016
  • 1 min read

Today the guys were putting in the plumbing for the drainage so that when the cement goes in, there's still a path for the water and sewage to go out. There are actually very few points where the sewage leaves the house. Here are the pics.

Once the tubes are put in, the blocks get covered with plastic and the steel grid goes over it.

The plastic and steel grill is ready for the cement. Not the clearest picture, I know, but you get a gerneral idea.

Cutting the tubing to the right lengths.

They made a fire/oven with the rocks that are on the side of the lot and used the fire to heat the tubing to melt it and shape it.

This is the sewage tubing for the bathroom in the dance studio

This is the sewage tubing for the bathroom in the workshop.

This is the sewage tubing for my bathroom on the second floor.

This is the tubing for the guest bathroom.

Same tube just at a different angle.


Comments


About Eva  
Recent Posts
Archives
Our Community 

To be a part of Little Pond, please click here. 

Join our mailing list

Never miss an update

bottom of page