

Day 113: windows, door frames and a tattoo
Today there were little spots here and there that needed rendering. A few more days and they will be finished and ready for me to help...


Day 112: finished the outside of the house
Today they finished rendering the outside of the house. Tomorrow they will start rendering what's left of my bedroom and then they will...


Day 111:
Here's the overall summary of what was done this week. Today they finished the last wall in the living room/kitchen. This side is facing...


Day 110: Livingroom 1/2 done
The living room ceiling is done. It must have been a hard and messy day for them today. This is the other side of the living room......


Day 109: rendering the livingroom
The guys rendered the wall that needed the most furniture moving. You can tell when a ceiling has been done or not because there's grey...


Day 108: Doing the inside and ceilings
The guys are slowly finishing the inside of the house. Today they did the ceiling of the guest room and put in the frames for the windows...


Day 107: Done the North side
Looks like the guys finished rendering the north side of the house. there might be some walls on that side that are facing east or west...


Day 105: In the hands of another photographer
I took off for Madrid to visit some old friends and do some shopping. Some personal shopping and some shopping around for the house....


Day 104 pot pourri part 2
There was a lot going on today. Let's start with the rendering in the inner terrace. Look at what they used instead of scaffolding! That...


Day 103: Inner terrace
Today the guys were rendering the inner terrace and the bathroom. They made the main bathroom window smaller and fitted the 'pre frame'. ...