Day 111:

  • Writer: Eva Hu
    Eva Hu
  • Jul 8, 2016
  • 2 min read

Here's the overall summary of what was done this week.

Today they finished the last wall in the living room/kitchen. This side is facing the kitchen.

This is the side facing the living room.

In the background of the previous 2 pictures you can see part of the lobby. Below is the lobby that you can see better. It's also finished.

Not sure why there are kitchen appliances on the table...and on the kettle, there's a sign on the back that says " it works just fine"

Back of the house...check.

Inner terrace. check. (to be honest, it does look a little bumpy here above the kitchen window....hmmmm)

Here's another view of the kitchen window from inside the dance studio.

Above the pantry door.

Here are some door frames that were put in. I'm not sure why there is foam in some places and cement in others. Maybe there was foam and then cement put over...but i'm not sure.

Here's the doorway of the office and the main bathroom just by the bottom of the stairs.

This is the wall under the staircase going towards the office.

Here are some finished rooms. This is the guest bedroom.

This is the doorframe of the guest room. They will even it out.

Here's the guest bathroom. you will notice they didn't do the top part because there will be a suspended ceiling so that there is room for the pipes to go above. Luis says its best to have the water pipes run above so that if there is a leak. you will notice it right away. If the pipes run under the ground, you won't notice the problem until it becomes a serious issue.

Here you can see both terrace door frames put in.

This is the bathroom wall that's not done because the electric tubing needs to be finished.

Bathroom window.

Door frame for the wet room storage.

You can see the inside of the storage room. They put in blocks to fill the gap of the doorway. I think it's kind of curious, I'm not sure what they will do but I trust that they have a good solution.

Here's the electric box (breaker and i think the communications boxes for the house) Sure looks better than the day they put it in when it looked like something out of an alien movie.

Window frame of the office.

Office all finished inside. looking to the west

Office looking to the east.

Main bathroom. same thing here. the top part isn't done for the suspended ceiling and the right side, they need to cut the tubes and prepare it...I wonder if I was there last week, if they would have let me do it.

My Backyard desert of cement bags...and if you're wondering if there are tumble weed bags that roll across the sandy dune in my back yard the answer is YES.