Day 137
- Eva Hu
- Sep 20, 2016
- 1 min read

The guys swept the floors so that they could prepare for the last layer of cement.

This is the laundry room/pantry

dance studio

storage room

workshop floor

water pipe opening

They fixed ups the holes

The floor painted after layer 3 (I painted the edges)

I painted the last half of the 3rd layer

after layer 4


Bathroom ceiling preparations in the workshop bathroom

bathroom in the studio

Cement poured and ready for waterproofing and painting.

Left over cement went into the final layer for the flooring

Tractors and trucks are busy going in and out of the plot.

They bulldozed the rocks in preparation for the terraces.


Comments