Day 133: channels for water pipes
- Eva Hu
- Sep 13, 2016
- 1 min read

By the time I arrived, the guys had finished cutting all the channels for the plumbing. They finally uncovered the pvc tubes that they stuck in the foundation when they were pouring the cement. Remember these? They were put in on Day 18. Today was the day they uncovered them.



Well today was they day they dug it up ;)


I'm not quite sure what this second hole is for.

this is the bathroom in the workshop.

This is the bathroom in the dance studio

master bath

for the outdoor shower on my private terrace :)

shower in the master bath

This is for the wash up sink in the workshop

Guest bathroom

main bathroom

This is the pantry where the washing machine will be. THere's a pillar there so they will have to move it over a bit to the left.


Comments