Day 80: steps
- Eva Hu
- May 26, 2016
- 1 min read

They took off the forms for the roof on the second floor. And poured the base of the stairwell today.


The crane lowered all the forms and support posts. and then loaded the blocks up on the roof today. I assume they will be doing that tomorrow?



Here are the stairs. they're going to do the handrails tomorrow and then the rest of the steps the next day.
There's a loooooot of steel bars that goes into a set of stairs.






I wonder if the guys ever think about sliding down this on their bum or a tray before the bumpy steps are installed. tomorrow if they finish the handrails and the steps are in yet, i'll try it ;)



Comments