Day 67: Preparing for Monday
- Eva Hu
- May 6, 2016
- 1 min read

They were putting up the last of the covers for the pillars today.


The guys were putting together a rebar. Most of them came assembled but I don't know why they had to put this one together from scratch.

I think they finally finished preparing all the columns for Monday. It's a lot slower to do when they are up so high....I didn't get to go up to take pictures but I think I got most of it a few days back. I think they spent most of the last 2 days doing the outer ones.






They're almost done the entire outer structure. They are getting started on the electricity soon and next week we will go to select the flooring. (tiles and wood for the floors)
for now the plans for the floor are:
Workshop - cement
Dance studio - wood
livingroom - still debating between wood and tile (or ceramic tiles that look like wood)
Bedroom upstairs - wood
Bedrooms downstairs - tile
bathrooms (all) - tile
Ground floor terraces - I like the wood that's on the boardwalk by the lighthouse in cotillo. it's grey and looks like raw wood. but luis says it's treated for being outside and it's also not that expensive.
Rooftop terraces there are 4. my bedroom terrace, 1 mini one behind my room and a medium size one on the side. There's also the dance studio terrace. I think they will all be cement (I'm thinking of making the terrace in my bedroom cement with wood decking over half of it. ....i think i might need some advice here)