Day 36:Preparing the rest of the frames


The guys finished up the rest of the columns in preparation for cementing the columns. Luis says he hopes all of it will be done before Easter becuase he says there's suppose to be lots of rain and wind easter weekend (in a week and a half)

I spoke to Luis about making 2 doorways to connect the studios and my home. (at least to the wet room.) and he said no problem. We looked for a place to make the doors and we found 2 spots. This wall below would conenct the workshop with the dance studio. There's a wash up sink planned in this area. but we can cut that out.

THis is the other side of the wall. This is the dance studio where the changeroom/storage section will be. I think it's the perfect place to hide a back door. (this is the perfect backstage entrance if ever the dance studio was converted into a stage!)

Here is another view. just farther back.


About Eva  
Recent Posts
Archives
Our Community 

To be a part of Little Pond, please click here. 

Join our mailing list

Never miss an update

bottom of page