Day 35 continued: covering the columns
- Eva Hu
- Mar 16, 2016
- 1 min read
The last post was getting long so i thought I'd post the second part of their work here. The rest of the columns are
Dance studio windows

window frames from kitchen to terrace

door frame from livingroom to lobby

These are the holes left from the clamps for the forms. Luis says he doesn't like leaving them there so they will patch it up. I've asked if I could help and he said I could. :)

This is all the wood from the frames. The guys say that after they're finished with the wood, we're going to have a big BBQ and everyone will bring their musical instruments. :) ha ha haa. can't wait!