Day 27: Are we there yet?
With everything that has been progressing so fast. You definately notice a difference in pace. (Not that they guys are working slower. They are still bustling along)
look at how tall the building is in respect to the guys. Luis is standing on the ground, which was raised already with gravel/rocks before the foundation.
And it's still going up.
This is the house. As it is, Luis says it still needs 3 more rows of blocks!
Below are pictures of the workshop and dance studio. These two buildings have 5 more rows to go.
Amazing what these 3 did in only 7 days of work!